Last Updated: May 15, 2026
From Deposit to Delivery: The Process Explained — Understanding our process helps you plan your kit home project. Here’s what happens from your initial enquiry through to frames arriving on your site, ready for construction.

Step 1: Initial Consultation
Contact us with your project concept—whether you have detailed plans, rough sketches, or just ideas. We’ll discuss: site location and conditions, design preferences, timeline expectations, and budget parameters. This conversation establishes whether our structure-only approach suits your project.
Step 2: Design Development
If you have approved plans, we work from those. If you’re starting fresh, you’ll engage a designer (we can recommend specialists experienced with steel frames). Design development produces floor plans, elevations, and sections suitable for engineering. Allow 4-8 weeks for design development, depending on complexity.
Step 3: Quotation
With design documentation in hand, we prepare a detailed quotation covering: wall frames, floor system (subfloor or first floor), roof trusses and purlins, structural connections and fasteners, and engineering documentation. Our quote specifies exactly what’s included and delivered. Review it carefully—ask questions about anything unclear.
Step 4: Deposit and Engineering
Accepting our quote triggers engineering commencement upon deposit receipt. Our engineers prepare: framing plans and elevations, member schedules, connection details, and compliance documentation to Australian Standards. Engineering typically takes 2-4 weeks. You’ll receive documentation for your certification/approval process.
Step 5: Approval Integration
While you progress building approval (using our engineering plus your architectural documentation), we hold pending manufacture confirmation. Once approval is granted and you’ve confirmed manufacturing can proceed, production scheduling begins.
Step 6: Manufacture
Your frames are manufactured to engineering specifications: steel cut, punched, and labelled; trusses assembled; components bundled and packed. Manufacturing takes 4-6 weeks depending on current workflow. We confirm delivery scheduling as production completes.
Step 7: Delivery
Frames deliver to your site on flatbed trucks. You’ll need: site access suitable for truck delivery, level unloading area, and someone to receive the delivery. We coordinate timing to suit your construction schedule. Unloading is typically your responsibility—ensure you have appropriate equipment or labour.
Step 8: Construction Support
Post-delivery, we’re available for technical questions during construction. If issues arise, contact us—we want your build to succeed. Your engineering documentation and labelled components should make assembly straightforward, but support is available.
Overall Timeline
From initial contact to delivery: typically 8-16 weeks. This includes design (if required), quotation, engineering, approval integration, manufacture, and delivery scheduling. Faster is sometimes possible; longer for complex projects. Plan realistically and communicate any time pressures early.
What deposit is required?
Typically 30% deposit to commence engineering, with balance prior to manufacture. We confirm exact terms in our quotation. Payment terms are negotiable for larger projects.
Can I change the design after engineering starts?
Minor changes are usually accommodated. Significant changes may require re-engineering at additional cost. Finalise design before engineering commences to avoid delays and extra expense.
What if my approval is delayed?
We hold projects pending approval confirmation. You won’t be charged for manufacture until you confirm proceeding. Approval delays are common; we work around them.
Do you deliver Australia-wide?
Yes. We deliver to all Australian states and territories. Remote locations involve higher freight costs—we quote freight based on your delivery address.