Subcontractor Checklist for Owner Builders — As an owner-builder, you’re the project manager. Coordinating subcontractors effectively determines whether your build runs smoothly or descends into chaos. Here’s a practical guide to managing the trades your kit home requires.

Aerial view of kit home build
Aerial view of kit home build

Essential Trades for Kit Home Completion

Site works and excavation: Clearing, levelling, trenching, and spoil removal. Often the first trade on site after approval.

Concrete/foundations: Whether slab, stumps, or piers—foundation work is critical and typically requires licensed contractors for structural concrete.

Frame installation: Some owner-builders DIY frame erection; others engage carpenters or specialised frame installers. For steel frames, ensure experience with LGS.

Roofing: Licensed roofers install roofing materials. This phase includes gutters, flashings, and downpipes.

Cladding: Depending on material—rendered panel, weatherboard, brick—different trades apply. Bricklayers for masonry; carpenters or cladding installers for sheet and board products.

Windows and doors: Often installed by the supplier or by carpenters. Ensure correct installation for warranty validity.

Electrical: Licensed electricians only. Rough-in during frame stage; final fix after linings.

Plumbing: Licensed plumbers for water, gas, and drainage. Rough-in and final fix like electrical.

Plastering/lining: Internal wall and ceiling linings. Usually a specialist plastering contractor.

Tiling: Wet area floors and walls. Waterproofing often done by the tiler or a specialist waterproofer.

Painting: Interior and exterior. Can be DIY or contracted depending on quality expectations and time.

Flooring: Carpet, timber, vinyl—usually specialist installers for each type.

Finding Reliable Subcontractors

Word of mouth remains the best source. Ask other owner-builders, building suppliers, or your certifier for recommendations. Check licenses on state databases (all states maintain public registers). Request references and actually call them.

Getting Quotes

Get three quotes minimum for significant work. Ensure quotes cover the same scope—a cheap quote that excludes items the others include isn’t actually cheap. Written quotes with clear scope protect both parties. Be wary of verbal agreements.

Contracts and Documentation

Use written contracts even for small jobs. Contracts should specify: scope of work, price (fixed or estimated), payment terms, timeline, responsibility for materials, and warranty terms. State-specific contract requirements may apply; check your owner-builder obligations.

Scheduling and Coordination

Create a master schedule showing all trades and dependencies. Share relevant portions with each subcontractor. Confirm start dates in writing closer to the time. Build buffer between trades—if plastering finishes Friday, don’t expect painters Monday.

Payment Practices

Standard practice: deposit on contract (10-30%), progress payments at milestones, final payment on completion. Never pay in full upfront. Retain final payment until defects are rectified. Document payment terms in your contract.

Do I need contractors for everything?

Licensed work (electrical, plumbing, gas) requires licensed contractors. Other work can be DIY if you have skills and time. Be realistic about your capabilities.

How do I check contractor licenses?

Each state maintains online registers. Search by name or license number. Verify the license covers the work type and is current.

What if a subcontractor doesn’t show up?

Communication is key—confirm in writing before scheduled dates. If issues arise, document them and discuss resolution. Persistent unreliability may warrant termination and finding alternatives.

Who is responsible if a subcontractor does poor work?

You are, as the owner-builder. This is why contracts, documentation, and inspections matter. You can pursue recourse against the subcontractor, but you’re ultimately accountable for the completed building.